Background

Project Overview

Non-Revenue Water Reduction Projects

Implementing a pilot project for ensuring continuous pressurized water supply in Pimpri Chinchwad as part of CDIA

This project is provide technical assistance to develop a hydraulic network model, assess reduction of NRW and implementing the continuous pressurized water supply in the Pimpri Chinchwad.

  • Lead 24x7 pilot zone in PCMC
  • Setting up the NRW units
  • Assess critical factors such as bulk supply, service storage etc.,
  • Condition assessment of existing infrastructure
  • Capacity analysis of the existing infrastructure and sizing the expansion
  • Hydraulic zoning and design of DMAs
  • Setting up hydraulic network model both for transmission and feeders and separately for distribution system
  • Recommendation on integrating information system, GIS and SCADA
Location & Country: Pimpri Chinchwad, Maharashtra
Name of Client: German Development Corporation (GIZ)
Duration of Assignment (months): 4
Start Date (month/year): March 2013
Completion Date (month/year): June 2013
Professional Staff Months Provided: 3
Names and designation of professional staff involved: Anand K Jalakam