Background

Project Overview

Non-Revenue Water Reduction Projects

Technical Services and Development of Hydraulic Model for the Pilot Zone

The objective of this study is to develop a hydraulic model for the pilot zones

  • Developing a hydraulic model for the pilot areas of Rahmania 1 – 28 KM network length, 300 connections (approx.), Rahmania 3 – 36KM network length, 550 connections (approx.)
  • The selected pilot area has 2 DMAs already and has an operational network that is delivering continuous water to consumers.
  • The deliverables are a working Hydraulic Model of the existing network calibrated to the existing operating conditions and parameters.
Location & Country: Sharjah
Name of Client: Environmental Solutions and Consultancy
Duration of Assignment (months): 1
Start Date (month/year): August 2020
Completion Date (month/year): August 2020
Professional Staff Months Provided: 1
Names and designation of professional staff involved: Bapu Bharghav, Team leader
 item